HomeNewsPhotos

Photos

19 AW kicks off ROCKI 20-01, prepares Ready Warriors
Loadmasters from the 61st Airlift Squadron load a generator onto a C-130J Super Hercules during phase one of ROCKI 20-01 at Little Rock Air Force Base, Arkansas, Nov. 7, 2019. Airmen loaded aircraft with cargo for the full-spectrum readiness exercise to simulate deploying to a forward location. (U.S. Air Force photo by Airman 1st Class Mariam K. Springs)

Download Image: Full Size (2.85 MB)
Tags:
Photo by: Airman 1st Class Mariam K. Springs |  VIRIN: 191107-F-DN449-1002.JPG